Quick Links
Skip to main contentSkip to navigation

Skiatook Public Schools

Working...

Ajax Loading Image

 

2023 Bond Issue

Bond Information Video (external link)


2023 Bond Information

Skiatook Elementary Storm Shelter/Gymnasium:

  • Construction will begin Spring 2024

 

Auditorium Stage Upgrades:

  • Renovation will begin Summer 2024

 

Stadium Turf Replacement:

  • Dependent on the life span of existing turf 

 

Technology Upgrades:

  • Smart Panel Installation will take place over the Summer of 2023

 

 

 

 

 


 

Bond Proposition 1

Bond Proposition 2